Railroad Ballast

(2 customer reviews)

Railroad Ballast keeps water moving and builds a solid, compactable base for drives, pads, and drainage. Delivered in bulk with volume pricing.

How much Railroad Ballast do you need?

Tell us your project size and we’ll figure out how many tons you need. Already know? Type the number below.

Pick a project size

Or type your exact dimensions below.

Typical depths: paths 2 to 3 in, driveways/patios 4 to 6 in, drainage or backfill 12+ in.

You’ll need approximately
tons
Tap + / − or type to adjust
Recommendation

Enter your project size or quantity above.

SKU: Railroad Ballast Category: Tags: , , ,
  • Size2 - 3"
  • Weight2900 lb/yd³
  • ColorGray
  • Sold byton

About Railroad Ballast

Engineered, dense-graded aggregate that compacts under heavy load, the structural foundation under driveways, parking lots, slabs, and walkway pavers.

MaterialRailroad Ballast
CategoryConstruction & Base
Stone size2 - 3"
Weight2900 lb/yd³
ColorGray
Sold bythe ton

How much will you need?

One ton of Railroad Ballast covers roughly:

112 sq ftat 2" deep
74 sq ftat 3" deep
56 sq ftat 4" deep

Tons ↔ cubic yards for Railroad Ballast

1 cubic yard of Railroad Ballast weighs about 2,900 lb ≈ 1.45 tons. One ton covers roughly 0.69 cubic yards.

Cubic yards → tonsTons → cubic yards
1 yd³ ≈ 1.45 tons 2 tons ≈ 1.38 yd³
2 yd³ ≈ 2.9 tons 5 tons ≈ 3.45 yd³
3 yd³ ≈ 4.35 tons 10 tons ≈ 6.9 yd³
5 yd³ ≈ 7.25 tons 20 tons ≈ 13.79 yd³
10 yd³ ≈ 14.5 tons

Figures are approximate: moisture and compaction change weight.

How to install Railroad Ballast

  1. 1
    Strip & compact subgrade

    Remove organics; proof-roll the subgrade until it tightens up.

  2. 2
    Lay in lifts

    Place in 4" lifts; compact each lift to 95%+ modified Proctor.

  3. 3
    Moisture-condition

    A light mist before compacting helps fines bind without flooding.

  4. 4
    Check elevations

    Final base should be smooth, dense, and within 1/4" of grade.

2 reviews for Railroad Ballast

  1. Cory A.

    Solid under the shop pad

    Used 10 tons of railroad ballast as the bottom layer under a pole barn slab area. Went down thick, about six inches, and gave the base course something firm to sit on. Gray color, uniform size, hardly any fines in the load. The dump truck spread it out a bit as it drove forward, which saved me an hour of raking.

  2. Ruben D.

    Big rock, drains great

    Put 6 tons of railroad ballast down along the back of the barn where water used to sit for days after a storm. It is big two to three inch rock, gray, angular, and it lets water run straight through. Nothing has puddled since. Driver dumped it in two piles so I could spread from both ends with the tractor.

Add a review

Your email address will not be published. Required fields are marked *

RELATED MATERIALS

Similar materials

0
    0
    Your Cart
    Your cart is emptyReturn to Shop